Fast Facts on Summit Carbon Solutions Pipeline:

● This would be the largest CO2 pipeline in North America (2060 miles) the route north of Bismarck would consist of a 24 inch pipeline. The SCS pipeline has a maximum flow rate of 936 million cubic feet per day and a capacity of 18 million tons of CO2 each year. Summit has never built a pipeline before.

● Dozens of landowners in North Dakota have been s…

Keep reading with a 7-day free trial